INTERNATIONAL GENERAL CERTIFICATE (2011 specification) UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITONCandidate report template
Student number _______________________________ Location ______________________________________ Date of review / /
Introduction including overview of area inspected and activities taking place This report follows an inspection of the worksites of an oil and gas company based in XXX in order to meet the requirements of the NEBOSH IGC 3 practical application. The Company is a leading engineering, procurement, construction and installation (EPCI) focused on the offshore upstream oil and gas market worldwide. The company’s headquarter is in XXX and one of its four (4) geographical business unit is in the …show more content…
Recommendations – include as a table in the following format:
Recommendation Scrap materials of various types were stored in between porta cabins and sidewalks (7) Use of multiple extension cable outlets used in recharging radios and mobile phones used in the work activities (8)
Likely resource implications
Priority
Target date
Disposal of scrap materials may cost USD 2,000
High
1 week
Installation of additional electrical outlets in the Facilities Dept which may cost USD 5,000
High
2 weeks
Brace rack storage bed and conveyors are blocked with dried leaves (9)
Send for servicing to remove dried leaves and arrange for regular inspection and maintenance of the conveyors which may cost USD 3,000 per month
High
2 weeks
Flanges stored in Deck shop area without adequate dunnage / support (12)
Request for additional dunnage / support which may cost USD 8,000
High
1 week
A hammer with loose hammer head and in damaged condition was noted at the work site (16) Compressed cylinders, paint and thinner placed directly under the heat of the sun (18)
Request for replacement which may cost USD 100
High
Immediately
Relocate and provide a shaded storage area for such cylinders and chemicals which may cost USD 10,000
High
2 weeks
2 meter clearance from fence is not maintained (21)
Disposal of scrap materials may cost USD 2,000
High
1 week
Protruding scaffolding